Imdam, Irma Agustiningsih and Rizki, Ahmad Fariz (2017) Modifikasi Material Handling untuk Mengurangi Defect dan Lead Time pada Lini Pengecatan dalam Rangka Menerapkan Lean Six Sigma. Prosiding SAINTIKS FTIK UNIKOM.
Text
B.2.1 Prosiding Nasional 2017_1.pdf Download (745kB) |
Item Type: | Article |
---|---|
Subjects: | Q Science > Q Science (General) |
Depositing User: | Admin STMI |
Date Deposited: | 29 Apr 2023 10:27 |
Last Modified: | 29 Apr 2023 10:27 |
URI: | http://repository.stmi.ac.id/id/eprint/542 |
Actions (login required)
View Item |